Capital Improvement Projects

ProjectProject ScopeEngineer ContractorEngineering ConstructionFunding Source
Anticipated Completion
Lift Station Number 23 ExpansionDesign a 2 MGD expansion to Lift Station Number 23HDR Engineering, Inc
Bell Contractors
$166,876

$1,109,756

2012 Water and Sewer BondSeptember 2015
12 Inch Mohawk Drive / Clear Creek Road Water LineConstruction of a 12 inches water line that will serve several developments in the Airport Pressure PlanMitchell and WB
McLean and WB
$799,2612013 Water and Sewer BondTo Be Determined (TBD)
18 Inch Sewer Gravity MainA City/Owner Agreement to upsize a sewer main in Prairie View Phase 3 to an 18" lineMitchell and Associates$276,5052007 Water and Sewer BondTBD
Water Reuse ProjectDevelopment of a Reuse Master Plan and the funding of WCID Number 1's project to provide infrastructure of transport reuse water to desired COK locationsFreese and Nichols
WCID Number 1
$1,277,6372013 Water and Sewer BondTBD
Miscellaneous Water System ImprovementsA series of small projects to increase the efficiency of the water distribution system to include, SCADA upgrade at the pump station, installation of a 16" control valve at Pump Station Number 4 and a new control valve controls at Bundrant ESTCoK
CoK Panels USA
$414,4902013 Water and Sewer BondDecember 2015
Septic Tank Elimination Program Phase IX (STEP Ph IX)Design the sanitary sewer improvements as part of the Septic Tank Elimination Program Phase IX in the Tanglewood Estates SubdivisionThe Wallace Group
Bell Contractors
$127,290

$626,997

Water and Sewer FundOctober 2015
Sewer Line Rehabilitation Phase 2Rehabilitation of sewer line that was assessed as defective by Pipeline AnalysisCity of Killeen$759,7222013 Water and Sewer BondApril 2016
Sewer System Evaluation Survey and Rehabilitation Phase 3Sewer System Analysis will evaluate sewer pipes to locate defects, establish cost repair estimates, prepare a sewer line rehabilitation plan and execute improvement constructionCity of Killeen
Pipeline Analysis/CoK
$429,3762012 Water and Sewer BondSeptember 2015
Water Line Rehabilitation Phase 1Rehabilitation of water lines in the area bordered by 10th St., 28th St., Rancier Avenue and Veterans Memorial BoulevardCity of Killeen
Wachs Water Services
$1,617,6502013 Water and Sewer BondDecember 2015
Stagecoach Road Reconstruction Phase 2 ConstructionConstruct roadway improvements to Stagecoach Road from Tyrel Drive to East Trimmier Road including widening to a 4-lane urban roadway, continuous center left turn lane, curb and gutter and drainage and water systemMcLean Construction$15,665,8802011 Certificate of Obligation BondApril 2016
Elms Road ExtensionConstruction of Elms Road from SH195 West to Carpet LaneMitchell and Associates
Gary W Purser Construction
$455,630

$3,624,687

2011 Certificate of Obligation BondDecember 2015
Trimmier Road Widening ConstructionConstruct roadway improvements to Trimmier Road from U.S.190 south to Elms Road and U.S.190 north to Jasper Road. Rebuilding existing 4-lane roadway to a 4-lane urban roadway with continuous center left turn lane and a curb and gutter section; storm drain system. Additionally, the widening of WS Young Drive from Bacon Ranch Road to Little Nolan Road to include a continuous left turn lane, extending Lowe's Boulevard from Trimmier Road to Florence Road are contiguous projects combined into one bid packageMitchell and Associates
McLean Construction
$774,000

$6,845,845

2014 Certificate of Obligation BondDecember 2016
US 190 / FM 2410 / Rosewood Drive ConstructionConstruct improvements to FM 2410 from 3470 to Highland Oak Drive; construct improvements on U.S. 190: and construct extension of Rosewood Drive with new interchange at U.S. 190HDR Engineering / Mitchell
James Construction Group, LLC
$1,821,567

$22,323,251

Sale of General Bond (Pass-through Agreement Reimbursement)September 2015
Elms Road Highway Safety Improvement Program (HSIP) GrantUpgrade safety enhancements to a section of Elms Road spanning from Chisholm Trail to Kaydence Court. Improvements will include installation of streetlights, roadway signage, sidewalks and a metal beam guard fenceCoK$584,291 (estimated)Elms Road HSIP GrantTBD
Continuous Flow Configuration - Preliminary DesignDesigning a continuous flow configuration for Stagecoach Road and its intersections with WS Young Drive and Featherline Road to preserve north-south mobilityWalker Partners, LLC$49,0002011 Certificate of Obligation Stagecoach Road ImprovementsTBD
Killeen-Fort Hood Regional Trail Segment 3Segment 3 of the regional trail, a 1.35 mile section from Watercrest Road to West Elms Road running along the South Nolan Creek residential section. Components of the trail include: trail constructed of concrete, low water crossings and neighborhood connections with ramps, signage, striping and street crossingsHalff Associates, Inc
RM Rodriguez
$270,000

$2,109,000

Reimbursement Resolution Killeen-Fort Hood Regional TrailTBD
Brookhaven - Rancier Sidewalk DesignSidewalk improvements around Brookhaven / Rancier Elementary Schools. Hike and bike trail with lights to be installed connecting Brookhaven Subdivision to both schoolsCoK$69,400 (estimated)TAP Grant / Child Safety Escrow FundTBD
Bermuda / Ronstan Phase 1Improve existing flooding conditions along the Bermuda and Ronstan Phase 1Freese and Nichols, Inc.
TBD
$69,685

$722,722 (estimated)

Drainage Utility BondTBD