Capital Improvement Projects
Project | Project Scope | Engineer Contractor | Engineering Construction | Funding Source | Anticipated Completion |
---|---|---|---|---|---|
12 Inch Mohawk Drive / Clear Creek Road Water Line | Construction of a 12 inches water line that will serve several developments in the Airport Pressure Plan | Mitchell and WB McLean and WB | $799,261 | 2013 Water and Sewer Bond | To Be Determined (TBD) |
Water Reuse Project | Development of a Reuse Master Plan and the funding of WCID Number 1's project to provide infrastructure of transport reuse water to desired COK locations | Freese and Nichols WCID Number 1 | $1,277,637 | 2013 Water and Sewer Bond | TBD |
Miscellaneous Water System Improvements | A series of small projects to increase the efficiency of the water distribution system to include, SCADA upgrade at the pump station, installation of a 16" control valve at Pump Station Number 4 and a new control valve controls at Bundrant EST | CoK CoK Panels USA | $414,490 | 2013 Water and Sewer Bond | December 2015 |
Septic Tank Elimination Program Phase IX (STEP Ph IX) | Design the sanitary sewer improvements as part of the Septic Tank Elimination Program Phase IX in the Tanglewood Estates Subdivision | The Wallace Group Bell Contractors | $127,290 $626,997 | Water and Sewer Fund | October 2015 |
Sewer System Evaluation Survey and Rehabilitation Phase 3 | Sewer System Analysis will evaluate sewer pipes to locate defects, establish cost repair estimates, prepare a sewer line rehabilitation plan and execute improvement construction | City of Killeen Pipeline Analysis/CoK | $429,376 | 2012 Water and Sewer Bond | September 2015 |
Water Line Rehabilitation Phase 1 | Rehabilitation of water lines in the area bordered by 10th St., 28th St., Rancier Avenue and Veterans Memorial Boulevard | City of Killeen Wachs Water Services | $1,617,650 | 2013 Water and Sewer Bond | December 2015 |
Stagecoach Road Reconstruction Phase 2 Construction | Construct roadway improvements to Stagecoach Road from Tyrel Drive to East Trimmier Road including widening to a 4-lane urban roadway, continuous center left turn lane, curb and gutter and drainage and water system | McLean Construction | $15,665,880 | 2011 Certificate of Obligation Bond | April 2016 |
Trimmier Road Widening Construction | Construct roadway improvements to Trimmier Road from U.S.190 south to Elms Road and U.S.190 north to Jasper Road. Rebuilding existing 4-lane roadway to a 4-lane urban roadway with continuous center left turn lane and a curb and gutter section; storm drain system. Additionally, the widening of WS Young Drive from Bacon Ranch Road to Little Nolan Road to include a continuous left turn lane, extending Lowe's Boulevard from Trimmier Road to Florence Road are contiguous projects combined into one bid package | Mitchell and Associates McLean Construction | $774,000 $6,845,845 | 2014 Certificate of Obligation Bond | December 2016 |
Elms Road Highway Safety Improvement Program (HSIP) Grant | Upgrade safety enhancements to a section of Elms Road spanning from Chisholm Trail to Kaydence Court. Improvements will include installation of streetlights, roadway signage, sidewalks and a metal beam guard fence | CoK | $584,291 (estimated) | Elms Road HSIP Grant | TBD |
Killeen-Fort Hood Regional Trail Segment 3 | Segment 3 of the regional trail, a 1.35 mile section from Watercrest Road to West Elms Road running along the South Nolan Creek residential section. Components of the trail include: trail constructed of concrete, low water crossings and neighborhood connections with ramps, signage, striping and street crossings | Halff Associates, Inc RM Rodriguez | $270,000 $2,109,000 | Reimbursement Resolution Killeen-Fort Hood Regional Trail | TBD |
Bermuda / Ronstan Phase 1 | Improve existing flooding conditions along the Bermuda and Ronstan Phase 1 | Freese and Nichols, Inc. TBD | $69,685 $722,722 (estimated) | Drainage Utility Bond | TBD |